Back to search

Publicly Accessible Charging Infrastructure for Electric Vehicles in Bavaria 2.0
Open

Grant
Last updated: 14.6.2025

The Free State of Bavaria supports the accelerated expansion and widespread dissemination of publicly accessible charging infrastructure for electric vehicles. This program offers grants for the construction, replacement, and modernization of charging stations and their associated grid connections in Bavaria. The funding significantly contributes to strengthening electromobility and achieving climate protection goals.

Who is funded?

This funding program is aimed at natural and legal persons, including municipalities and districts, who wish to promote the expansion of publicly accessible charging infrastructure for electric vehicles in Bavaria. The goal is to promote a comprehensive and demand-oriented charging infrastructure to strengthen electromobility and achieve climate protection goals.

What is funded?

The program subsidizes the procurement and construction of publicly accessible charging infrastructure and associated grid connections in Bavaria. Both normal and fast charging points are funded. The measures also include replacement purchases and modernizations of existing infrastructure, provided added value is demonstrated.

Type and Extent of Funding

The funding is provided as a non-repayable grant within the framework of project funding. The total funding volume is 20 million Euros. The maximum funding amounts are set out in calls for proposals and can amount to up to 60 percent of eligible expenses, with maximum amounts depending on the type of charging point or grid connection. The maximum project duration until commissioning is 12 months.

Conditions and Requirements

Specific legal and technical requirements apply to the funding. The project may not commence before approval. The charging infrastructure must be publicly accessible, supplied by renewable energies, and remain in operation for at least six years. In addition, technical minimum requirements and online reporting must be met.

Application Procedure

The application procedure is single-stage and takes place electronically via the project executing agency's form system. In addition, a legally binding signed written version must be submitted within four weeks. The allocation of funding is carried out via separate calls for proposals, each setting deadlines and detailed requirements.

The funding program is based on the funding guideline "Publicly Accessible Charging Infrastructure for Electric Vehicles in Bavaria 2.0" of the Bavarian State Ministry for Economic Affairs, Regional Development and Energy. The grants are awarded in accordance with the Bavarian Budget Code and are subject to EU state aid rules.

#Electromobility Bavaria#Charging Infrastructure Funding#EV Charging Stations#Grant Bavaria#Public Charging Points#Charging Infrastructure Expansion#Renewable Energy Charging#Bayern Innovativ#Municipalities Charging Stations#Grid Connection Funding#DC Charging Points#AC Charging Points#Environmentally Friendly Mobility#E-Mobility Funding#Sustainable Transport Transition

Funding Overview

Maximum Amount

Maximum Amount:

100,000 Euros

Open Until

Open Until:

31.12.2025

Award Channel

Award Channel:

Framework Programme Call

Region

Region:

Bavaria

Sectors

Sectors:

Renewable Energy, Transportation and Logistics, Other

Funding Stages

Funding Stages:

Implementation, Infrastructure

Funding Provider

Program Level: Regional

Funding Body: Bavarian State Ministry for Economic Affairs, Regional Development and Energy (StMWi)

Managed By: Projektträger Bayern, Bayern Innovativ – Bavarian Society for Innovation and Knowledge Transfer mbH

Website: Projektträger Bayern, Bayern Innovativ GmbH