Funding for Small Wastewater Treatment Plants

Last updated: 14.6.2025
Grant

The Free State of Thuringia promotes investments in small wastewater treatment plants to improve water protection and modernize wastewater treatment. The program targets private property owners and municipal wastewater disposal authorities. It offers both grants and low-interest loans for the new construction, replacement, and retrofitting of domestic wastewater treatment facilities.

Who is Funded

This guideline supports property owners, leaseholders, and municipal wastewater disposal authorities in the Free State of Thuringia with investments in small wastewater treatment plants. The program aims to improve water protection and increase the proportion of modern wastewater treatment facilities.

What is Funded

The program funds investments in the new construction, replacement, and retrofitting of small wastewater treatment plants for domestic wastewater, as well as the construction of wastewater sewers in public spaces for group small wastewater treatment plants. Additionally, advisory and organizational services provided by municipal authorities are supported.

Type and Extent of Funding

Funding is provided in the form of non-repayable grants or low-interest loans. The amount of grants depends on the type of measure and the number of inhabitant equivalents, while loans have fixed conditions.

Conditions and Requirements

The funding for small wastewater treatment plants is subject to specific legal, technical, and organizational requirements. These include the permanent non-connection to public sewers, compliance with technical standards, water permits, and proof of regular maintenance. Furthermore, specific De Minimis regulations must be observed.

Application Procedure

The application procedure for funding small wastewater treatment plants in Thuringia is multi-stage and includes an annual announcement by municipal authorities, an examination of applications at the municipal level, and forwarding to the Thuringian Reconstruction Bank. The approval and disbursement of funding take place after the completion of the plant.

The funding for small wastewater treatment plants in Thuringia is based on a specific guideline from the Thuringian Ministry for Environment, Energy and Nature Conservation. This guideline is supplemented by further state and federal legal provisions, as well as by an EU regulation on De Minimis aid.

Similar Programs

#Small Wastewater Treatment Plants Funding Thuringia#Wastewater Treatment Thuringia#Grant Small Wastewater Treatment Plant#Loan Small Wastewater Treatment Plant#Water Protection Thuringia#Environmental Funding Small Wastewater Treatment Plants#Rural Wastewater Disposal#Small Wastewater Treatment Plants New Construction#Small Wastewater Treatment Plants Retrofitting#Biological Treatment Stage#Wastewater Sewers Funding#Group Small Wastewater Treatment Plants#Private Builders Wastewater#Municipal Authorities Funding#Wastewater Disposal Concept#De Minimis Thuringia#Thuringian Reconstruction Bank

Funding Overview

Funding Status

Funding Status:

Closed

Maximum Amount

Maximum Amount:

EUR 25,000

Open Until

Open Until:

31.12.2023

Award Channel

Award Channel:

Demand Driven Scheme

Region

Region:

Thuringia

Sectors

Sectors:

Water and Waste Management, Environmental and Climate Protection

Beneficiaries

Beneficiaries:

Households and Municipalities in Wastewater Disposal

Application Type

Application Type:

Optional Consortium

Funding Stages

Funding Stages:

Planning, Implementation, Infrastructure, Capacity Building

Funding Provider

Program Level:

Regional

Funding Body:

Thuringian Ministry for Environment, Energy and Nature Conservation

Managed By:

Thuringian Reconstruction Bank (TAB)

0 x 0
XS