New Construction, Expansion, Reactivation, and Replacement of Rail Sidings (Connection Funding Guideline)
Open

Grant
Last updated: 14.6.2025

This federal funding program supports commercial enterprises in investing in their rail sidings and rail freight transport facilities. The goal is to shift freight transport from road to rail to relieve infrastructure and achieve environmental benefits. Grants are provided for the new construction, expansion, reactivation, and replacement of rail sidings and multifunctional transhipment facilities.

Who is Funded

This funding guideline is aimed at commercial enterprises in private legal form throughout Germany that wish to invest in their rail infrastructure. The overarching goal is to shift freight transport from road to rail and to permanently secure these transports, thereby reducing truck journeys.

What is Funded

The program supports investments in the new construction, expansion, reactivation, and replacement of rail sidings and associated rail freight transport facilities. Various facilities and related cost categories are funded to improve the functionality and efficiency of rail connections and optimize freight transport.

Type and Scope of Funding

Funding is provided as a non-repayable grant. The amount of the grant varies depending on the type of facility and the rail freight transport volume or performance achieved, with specific maximum values per tonne or tonne-kilometre. The funding rates are limited to a maximum of 50% or 80% of eligible costs, and there is a de minimis threshold of EUR 15,000.

Conditions and Requirements

Various conditions must be met for applying for and receiving funding, relating to the project start, economic viability, proof of transport volume, and ensuring financing. Specific legal and operational requirements must also be observed to ensure efficient and purpose-bound use of funds.

Application Procedure

The application for funding must be submitted in writing to the Federal Railway Authority. After complete submission of the documents, examination and decision will take place within three months. The grant notification will only be issued upon receipt of the necessary building permit.

The funding program is based on a specific federal guideline and is regulated by various overarching laws and administrative regulations. These define the legal framework for funding, application review, and the use of funds.

#Rail siding funding#Rail freight grant#Rail sidings reactivation#Rail siding new construction#Connection funding guideline#BMDV funding#Rail infrastructure#Transport shift grant#Freight transport funding#Federal Railway Authority#Rail-road transhipment#Access tracks funding#Industrial main lines grant#Rail infrastructure#Logistics funding#Mobility funding Germany#Environmental protection transport#Funding for companies#Transport infrastructure

Funding Overview

Maximum Amount

Maximum Amount:

Up to 50% of eligible costs for rail sidings and access/industrial main lines; up to 80% for multifunctional facilities. Maximum values of EUR 10.00/tonne or EUR 40.00/1,000 tonne-kilometres per year, or EUR 300.00 per freight wagon or EUR 120.00 per 100 freight wagon-kilometres.

Open Until

Open Until:

31.12.2025

Award Channel

Award Channel:

Demand Driven Scheme

Region

Region:

Germany

Sectors

Sectors:

Transportation and Logistics

Beneficiaries

Beneficiaries:

Commercial enterprises investing in rail freight transport facilities.

Funding Stages

Funding Stages:

Implementation, Infrastructure

Funding Provider

Program Level: National

Funding Body: Federal Ministry for Digital and Transport (BMDV)

Managed By: Federal Railway Authority (EBA)

Website: Eisenbahn-Bundesamt